Overview

Show HA setup and their Synchronization.

Pre-requisite

2 CCE (192.168.2.x) servers to be configured at DC in active-passive mode.

...

Once a day, the DC data will be synchronized with the DR.

Test Procedure

...

(In the above diagram ignore the DCDR network on the right side)

1-   Setup HA APEs and check to make sure both are getting the logs and flows on the dashboard as well as on data ingest i.e., system dashboard.

...

3-   Please note that the actual IP addresses may be different during test

 Case I- when cce 1 and 2 are active, ape 1 and 2 are active.  (This is step 1 above)

...

Demonstrate – console (ape 1 or 2 ) https:x.y.z.a

Run for 15 min

 Case II – cce 1 down , repeat the steps above

 

 

Case III- cce 1 up, ape 1 down , above steps

 Case Iv- cce 1 down , ape 1 down , steps

...

APE-01 will become passive APE

Expected Output

...

1-   Both APEs should have the similar data sets on the performance dashboard before the test scenarios are executed.

2-   At the end of Scenario-1, verify that the active APE is accessible.

3-   Verify that the performance dashboard shows data over the last few minutes.

4-   At the end of Scenario-2, verify that the newly active APE is accessible